Michael Ochoa Submits Plans for Silverado Hotel-Casino South of Las Vegas Strip
Written by Riley Brooks · Aug 26, 2026

Michael Ochoa Submits Plans for Silverado Hotel-Casino South of Las Vegas Strip

Local developer Michael Ochoa has filed plans with Clark County for a new hotel-casino resort called Silverado on a 13.5-acre site at the northwest corner of Las Vegas Boulevard and Richmar Avenue, several miles south of the Las Vegas Strip, and the submission outlines two distinct development phases that together would bring hundreds of rooms plus substantial gaming and support facilities to the area. The first phase calls for 300 hotel rooms paired with a 57,000-square-foot casino, along with food-and-beverage outlets, entertainment venues, and conference space, while the second phase would add 150 more rooms, two six-story hotel buildings, and a five-level parking garage to complete the project footprint.
Site Location and Project Scope
The chosen parcel sits along Las Vegas Boulevard well below the main Strip corridor, which places the proposed resort in a corridor where other hospitality projects have appeared in recent years, and county records show the filing includes conceptual plans and drawings that detail how the buildings would occupy the land without overlapping existing rights-of-way. Observers note that the 13.5-acre size allows room for surface features such as landscaping and vehicle circulation in addition to the core structures, while the phased approach lets construction proceed in stages that match financing and market conditions.
First Phase Details
Under the initial stage, the 300-room hotel tower would rise alongside the 57,000-square-foot casino floor, and the accompanying food-and-beverage outlets plus entertainment and conference facilities would occupy separate structures connected by pedestrian walkways. The filings indicate that the casino would occupy a single level with standard gaming layouts, whereas the hotel rooms would be distributed across multiple floors above the public areas, creating a compact vertical profile that leaves open space for the later additions.

Second Phase Additions
The second phase introduces two six-story hotel buildings that would bring the total room count to 450, and a five-level parking garage would provide structured parking once surface lots reach capacity. According to the submitted documents, these elements would be positioned to the north and west of the first-phase structures, preserving access routes and allowing the resort to expand its guest capacity without disrupting ongoing operations at the original casino and tower.
Regulatory Process Ahead
Clark County officials have received the application package, which now moves into the standard review sequence that includes zoning verification, traffic studies, and environmental assessments before any construction permits can be issued. The filings referenced but no direct public link provided in coverage show that Ochoa’s team supplied preliminary engineering drawings, and county staff will circulate those materials among relevant departments for comment during the coming months. Once the review concludes, the project would still require final approvals from the Clark County Commission before groundbreaking could begin.
Development Timeline Considerations
Because the proposal arrives as part of ongoing growth along the southern Las Vegas Boulevard corridor, the timeline for Silverado remains tied to how quickly the county completes its checks and how market conditions evolve through late 2026. The phased design itself offers flexibility, since the first 300 rooms and casino could open while the second-phase structures remain under construction, and that sequencing has appeared in other Southern Nevada resorts that scaled up after initial openings. County records do not yet list a public hearing date, yet the filing itself signals that planning work has advanced far enough for formal submission.
Conclusion
The Silverado filing represents a concrete step toward adding another gaming and hospitality option several miles south of the Las Vegas Strip, and the details contained in the Clark County submission outline a clear two-phase build-out that begins with 300 rooms and a 57,000-square-foot casino before expanding to 450 rooms and structured parking. As the review process unfolds, additional information on design refinements and scheduling will become available through standard county channels.